defining the process

                    > eisys/healthcare® employs a multi-step process to insure your project is completed in the most
                       professional manner, on time and on budget.
                    > project management  eisys/healthcare® will assign an experienced, highly trained Project Manager
                       to be responsible from inception to conclusion. The Project Manager is well versed in equipment
                       sales, service, the PACS implimentation process and your corporate standards program for
                       PACS ergonomic workcenters.
                    > project analysis  Using the site visit form and the project analysis supplement, the information
                       collection will be conducted by the PM.  The analysis will include in-scope equipment inventory,
                       reading station locations and general facility logistics. This will determine the appropriate standard
                       ergonomic workcenter configuration for each facility, plus any desired accessories from the
                       standard offering.
                    > drawing preparations  The eisys/healthcare® Designer will prepare a drawing with the location
                       of the new ergonomic workcenter(s).  These drawings will be used as installation drawings for the
                       eisys/healthcare® Lead Installer, should installation services be enlisted.
                    > proposal preparation  The eisys/healthcare® Customer Service Representative, under the
                       direction of the PM, will prepare an electronic quotation based on the results of the project analysis. 
                       Quotations will include the appropriate standard workcenter(s),     
                       optional accessories if any, carts  if any, freight and installation/in-service training services as
                       required.  These documents will be sent in .pdf form via email to the Client for approval and processing.
                    > order entry  Upon receipt of a purchase order, the eisys/healthcare® Customer Service Representative
                       will enter the order and acknowledge receipt within five (5) business days.  The acknowledgement will
                       be forwarded in .pdf form via email to all parties.  It will include a tentative ship date based on the
                       scheduled “Go Live” date minus 4 weeks.  Any discrepancy between proposal and purchase order
                       will be addressed at this time.
                    > scheduling  The eisys/healthcare® Project Manager will communicate via conference calls and/or group
                       emails with the  Client to track the implementation process.  Should the Client choose to engage our
                       installation services, it will be imperative that we coordinate the shipment, receiving and installation
                       with all appropriate parties.  We understand the limited space and manpower available at each facility;
                       therefore every attempt will be made to schedule shipment and receipt within 24-72 hours of the actual
                       installation date.*
                    > quality management  The eisys/healthcare® Customer Service Representative will conduct a one year
                       telephone audit on product performance to diagnose all warranty and abnormal wear issues.  If required,
                       necessary steps will be taken to rectify such issues.
                    > installation and training services  Should you choose to engage eisys/healthcare® installation services,    
                       the Lead Installer will provide on-site project management as well as in-service training for facility
                       personnel.  Additionally, this person will be responsible for moving the product from the receiving area
                       to the staging/installation area.  The installers will work with your PACS Team to properly install all
                       monitors and provide final cable management at the workcenter.  Upon completion, the Lead Installer
                       will train all available doctors on the proper use of the workcenter.  He will review the technical manual
                       and the general assembly/troubleshooting guide with the plant operations staff and prior to leaving
                       the facility obtain sign-off approval.
    
                        *Each facility receiving department will be responsible for accurate receipt, damage inspection and
                        proper storage of the product.  The eisys/healthcare® Project Manager or Customer Service Representative
                        must be notified within 24 hours of receipt of shipment if damaged or missing parts are noted or suspected. 
                        Digital photos of the shipment and its condition  would be helpful in case there is a need to identify damages
                        prior to arrival on-site.